ONBOARDING • Corporate teams
Design team kit — to the studio rhythm
Contents, price and lead times when the choice is driven by respect for the detail: first impression balanced against budget.
What the Design team kit is
The design team kit is the studio’s daily life: hoodie, notebook, desk mat and pen for sketches and reviews. The kit is handed over together with the studio team and follows one rule: on the new person’s first day the brand must be felt physically.
The Design team kit plays a double role: practical, so the person is equipped on day one, and cultural, so the team and its values arrive without slogans. The driver is respect for the detail.
Contents and decoration
The core of the set: hoodies, branded notebooks, desk mats, mouse pads and pens. Decoration follows the item: print or embroidery for tees and hoodies, engraving or pad printing for deskware.
For the Design team kit, the planning cost per employee is 3500–13000 AMD (excluding 20% VAT), with an annual volume of 40–250 pcs. For senior tiers we propose premium items; for large volumes, a stored buffer for the next intake wave.
When it is handed over
A designer’s desk is the showcase of their work, and the desk mat becomes part of it. The hoodie is the team’s informal uniform, and the notebook paper is chosen so markers do not bleed through.
The risk we watch for: The risk is detail quality: a poorly printed gift is spotted instantly by a designer. That is why the Design team kit is kept packed in stock, and the size matrix is refreshed after every intake wave.
Fulfilment and lead times
Producing the Design team kit takes 4–8 working days, or 3–5 on rush handling after artwork approval. For the summer intern wave we start production in advance so the packs are ready at kickoff.
In corporate companies the kit is usually waiting at the desk on the very first working day. Delivery is 24–48 hours in Yerevan, 3–5 working days to the regions via HayPost or 1–2 days via SPS Express, and for remote staff FedEx, DHL or Onex to individual addresses. Every Design team kit shipment is tracked on one list.
- Colour approval
- brand colours locked against Pantone references; sample in 5–7 working days
- VAT
- quotes are in AMD and exclude 20% VAT
- Yerevan delivery
- 24–48 hours after order confirmation
- Production
- 4–8 working days, or 3–5 on rush handling after artwork approval
Independent supplier. merch.am is an independent B2B corporate-merch production and fulfilment partner for the Armenian market. Every figure on this page is in AMD and excludes 20% VAT, and represents a planning range rather than a quote. Kit composition, quantities and delivery windows are confirmed against a written brief before any order is placed.
Related pages
Frequently asked questions
How much does one Design team kit cost
One Design team kit is planned at 3500–13000 AMD per employee (excluding 20% VAT) at an annual volume of 40–250 pcs. The final price depends on contents, decoration and the size split.
What lead time should a Design team kit wave plan for
Production is 4–8 working days, or 3–5 after artwork, plus delivery. The Design team kit wave start date is known in advance, so packs are held in stock and distributed against the address list.
How do you guarantee design accuracy
For the Design team kit we approve artwork against Pantone references, keep a size matrix and refresh it before every wave. Changes before the print proof are free of charge.