Event procurement · construction and building materials week · trade-stand staffing · technical catalogue and specification print · contractor crew kits · Yerevan, Armenia

Construction Week Armenia: Stand Apparel and Crew Kits for Yerevan

A building materials week is a working show. The visitor is a contractor, a site engineer, an architect, a procurement manager from a developer or a distributor with a pallet on a truck outside, and they arrive carrying plans. That changes the merchandise in a specific way. Apparel has to survive a stand that is walked through in work clothes, and it has to look like the crew of a company that actually builds rather than like a conference attendee. Giveaways have to be useful on a site or they are weight in a bag. And the printed material is not a brochure: it is a technical catalogue, a specification sheet, a warranty card and a quick-reference card that a site engineer uses with gloves on and dust in the air, which sets a different paper and binding standard from any indoor forum. Two constraints belong in the brief from the first line. We do not supply or certify personal protective equipment, so anything regulated as high-visibility workwear or head protection is bought from a qualified supplier, and we decorate the crew’s existing garments and the company’s own helmets rather than manufacturing protective goods. And we do not produce structural, load-bearing or safety signage; printed wayfinding and specification material is documentation, and it stays documentation. This page covers the four merch lanes, the technical print specification, the staffing and shift patterns that drive quantities, and the freight behaviour that a heavy catalogue run creates on a hall delivery.

Programme facts for the procurement calendar

Programme window
Three to four working days of exhibition stands, technical sessions, contractor demonstrations and dealer meetings, with build-up before the first day and dismantling after the last; the next edition is planned for 25 and 26 March 2027
Stand build window
The single most important date on the calendar. Heavy printed material and assembled displays consume the same access slots as the stand structure itself, so the delivery slot is booked against the published build window rather than against the opening day
Working lead time
Technical catalogue and specimen run 10 to 14 working days; apparel decoration and crew kit assembly 10 to 12 working days; delivery to the venue 5 to 7 working days before the build window opens
Venue
Yerevan, Armenia. Hall allocation, stand address, crane and loading access, and the closing-day collection window come from the organiser exhibitor manual and are re-confirmed before each shipment
Audience
Building materials and component manufacturers, contractors and site engineers, developers, architectural and engineering practices, dealer and distributor networks, project supervision and inspection bodies, and the construction trade press
VAT and invoicing
Standard 20% VAT applies to supply delivered into Armenia. Quotations and invoices are issued in Armenian dram against the buyer legal entity, registered address and tax account recorded on the order

The catalogue is the item that decides whether a construction exhibitor needs a supplier or a printer. A building materials stand usually carries a technical catalogue of 40 to 200 pages: product ranges, section drawings, performance tables, installation detail, fixing schedules, warranty terms and a specification block that an engineer copies into a tender document. That last function is the important one. The specification text is often lifted verbatim by a consultant into a bill of quantities, so the catalogue has to be typographically clean, the tables have to hold their alignment across a gutter, and the specification block has to be exact. Proofing therefore has to include the specification pages at full size, and the buyer’s technical author signs them, not the marketing team.

Bindery is the second decision that gets made too late. A 40-page product brochure and a 180-page technical catalogue are different jobs. The first is saddle-stitched or stapled and reads quickly on the stand. The second wants a lay-flat binding that opens on a bench: wire-O, Swiss binding or a sewn section for a catalogue that lives in a project folder. A lay-flat binding on a thin booklet produces a spine that cracks in the first week of use and reads badly in a tender submission, which is the worst outcome a technical catalogue can have.

The third decision is the site-use line. A quick-reference card handed to a site engineer gets handled with gloves on, gets rained on between the stand and a van, and gets carried in a pocket with grit in it. That line wants a heavier synthetic or coated stock, rounded corners, and a hole so it can be on a lanyard or a board rather than in a pocket. It is a small part of the print run and it is frequently the item the visitor keeps. It is also where the exhibitor brand mark ends up being seen on a live site, months after the show, which is worth designing for.

Quantities on this calendar come from two different populations and they are usually conflated. The trade-show population is the dealer and distributor network, sized by dealer count, and it is predictable a month out. The crew population is the company’s own site teams and the installer network, and it changes with the construction season: the same company will send twice the crew in spring than in late autumn. Crew kit sizing therefore needs a season assumption stated in the brief, and a revision window before the print run, because a crew pack is a personal-size item and cannot be re-cut once it is embroidered.

Four merch lanes for a construction and building materials week

Trade-stand and site-visit apparel

A cotton polo and a fleece or soft-shell layer for the stand team, plus a printed tee or a cap for staff who walk the aisles and join site visits. The specification is chosen for abrasion and laundering rather than for event photography: mid-weight combed cotton, a collar that survives a week of daily wear, and decoration on the chest or the sleeve so it is visible while someone is holding a sample board. Where a crew member already wears the company’s own work uniform, we decorate the existing garment or supply the over-layer. We do not manufacture or certify personal protective equipment: high-visibility workwear, helmets, gloves and eye protection are regulated items bought from a qualified supplier, and nothing we produce is described as protective or certified to a safety standard.

Helmet, cap and vehicle-adjacent decoration

The helmet lane is the one with the most requests and the most constraints. We produce printed decals and applied vinyl marks for the company’s own helmets, and embroidered or printed caps, and we produce full-colour printed vehicle panels and magnetic vehicle panels for the company’s own vans. We do not supply helmets, we do not modify a helmet, and we do not print on a helmet shell in a way that affects its structure or its surface finish; the decal is applied to a helmet the company already owns, by the company or by its own site services. Where a contractor requires certified head protection or certified high-visibility clothing, that requirement is met from a PPE supplier, and the merch brief stays outside it. The vehicle panel is produced as a printed or cut vinyl graphic on the company’s own vehicle, sized and installed by a local fitter.

Technical catalogue and specification print

The heaviest lane and the one with the longest calendar. A 40 to 200 page catalogue with section drawings, performance tables and a specification block is produced on 120 to 170 gsm coated or uncoated stock with a lay-flat binding chosen by page count: wire-O for a thick block, Swiss binding for a mid-range catalogue that must open flat on a bench, saddle stitch for a short brochure. Inside it, the specification sheets and warranty cards are separate short runs so they can be updated without re-running the catalogue, and the quick-reference site card runs on a heavier weather-resistant stock with rounded corners. Proofing is the discipline: a full-size proof of the specification pages, a gutter check on every table that crosses the spine, and a physical bound copy before release.

Contractor crew kits and stand staffing material

A crew kit is a personal bundle sized to the season: a cap or tee, a folded fleece for the winter months, a site notebook, a printed quick-reference card and a printed warranty or care card for the product the crew is installing. Packed per person, counted per crew, with a name or crew number on the packing list rather than on the garment where the crew would rather not wear a number. Alongside it, the stand staffing material: printed shift cards for a two-shift stand roster, a printed product rotation sheet for the staff running the stand, and a printed stock card so the stand team tracks what was handed out across a four-day week. Runs are 60 to 400 kits, and the figure follows the construction season rather than the show floor.

Print specification per item line

Construction exhibitors are split between a catalogue-heavy exhibitor who prints 2 000 technical volumes and a dealer-heavy exhibitor who prints 400 crew packs and almost no paper. The table below is the working specification we run most often, with quantities set by the dealer network and the construction season rather than by stand size.

Item lineMethodSubstrate and stockQuantity band
Technical catalogue, 40 to 80 pagesOffset litho, wire-O or Swiss binding150 gsm coated text, 250 gsm cover, section dividers500 – 2 000 copies
Technical catalogue, 120 to 200 pagesOffset litho, Swiss binding or sewn section120 to 150 gsm uncoated text, heavy cover stock200 – 800 copies
Specification sheetsFour-colour litho, single-fold, updated separately150 gsm coated, punch holes for site filing500 – 3 000 sheets
Site quick-reference cardOffset litho, rounded corners, hole punch250 to 300 gsm weather-resistant synthetic or coated500 – 3 000 cards
Stand team poloScreen print, one to three spot colours220 gsm combed cotton or cotton pique30 – 120 pieces
Stand team fleeceEmbroidery on chest or woven patch280 gsm fleece, neutral colourway20 – 60 pieces
Crew capEmbroidery, three-dimensional or flatSix-panel cotton or cotton-twill cap80 – 500 pieces
Helmet decal setCut vinyl or printed decal, applied by the buyerSelf-adhesive vinyl, supplied flat20 – 200 sets

Colour in this sector is chosen for visibility and for survival. A construction brand mark that is a light tint on a light shirt is invisible under outdoor stand lighting and in a project photograph the company will use for two years, so the apparel mark is normally a single dark or saturated colour on a light garment. Screen printing with mixed spot ink is the default, because a flat spot colour survives the laundering cycle that a printed gradient does not and holds the same value across a 400-piece crew run. Embroidery is used where the mark has to survive repeated washing on a cap or a fleece, and where the mark is a registered shape with fine internal detail the embroidery programme will simplify it, which is a conversation worth having before the file is locked.

Freight behaves differently here than on any other calendar in this site’s event list. A 200-page catalogue at A4 has a low unit weight and a high bulk factor, so a 2 000-copy run is a genuine volume problem at the venue door rather than a weight problem, and it competes directly with the exhibitor’s own stand materials for space in the build window. The practical answers are a road lane for consolidated catalogue cartons, a split delivery so the dealer cartons arrive in the first wave and the remaining catalogue stock in a second wave, and an agreed position for the surplus cartons inside the stand or in the venue storeroom so they are not standing in the access aisle. Where a project runs long enough to need ongoing stock, a printed reorder slip inside every catalogue is cheaper than reprinting.

Stock handling is the other construction-specific line. Building materials are heavy, dusty and often damaged in transit, so the site notebook, the specification sheets and the quick-reference card use heavier stock and, where a project runs outdoors, a protective sleeve rather than a bare card. It costs very little to add a sleeve at packing time and it prevents the exact failure that damages a brand’s credibility: a document that arrives unreadable because it tore in a site van.

Stand staffing drives quantities more than any other variable on this calendar. A stand that runs two shifts over a four-day week, with staff rotating through the stand and the hospitality area, needs more garments than a stand staffed by six people for four days, and the roster determines the size curve. Where the exhibitor runs a hospitality suite or a dealer lounge, the second shift needs its own layer, because the same fleece worn through four shifts reads as a staffing failure at exactly the moment a distributor is in the room. Sizes are taken from the roster by name, and the roster is closed earlier than the print release.

Planning timeline: four checkpoints from brief to build window

T minus nine weeks
Item lines and quantities split by audience, catalogue page count and binding chosen, PPE position confirmed in writing so the merch brief excludes regulated protective items, construction season crew count agreed
T minus seven weeks
Specification pages proofed at full size and signed by the technical author, bound catalogue sample approved, garment stock and colours confirmed against the stand roster
T minus five weeks
Catalogue and apparel production running, crew kit roster closed by name, hall, stand address, loading access and build window confirmed with the organiser and the freight forwarder
T minus one week
First carton delivered into the build window slot, second wave staged for the dealer re-stock, site quick-reference cards and warranty cards packed per crate for the exhibitor’s own distribution

VAT, invoicing and delivery lanes into Armenia

Supply delivered into Armenia carries 20% VAT, with the invoice issued in Armenian dram against the buyer legal entity, registered address and tax account recorded on the order. On a catalogue-heavy order the VAT line is the second-largest line on the invoice, which is why the entity details are captured at the brief stage rather than at shipment. A dealer group or a distributor running the stand through a regional entity has its invoicing route set by that entity rather than by the venue, and the entity is named on the order before the first carton leaves. Where the finance team requires the invoice in a structured electronic format for its own filing, the required format is stated with the brief and produced that way.

An international manufacturer can request the quotation header in USD or EUR with a dram equivalent line for the local invoice, because the domestic print and courier chain prices in dram and the exposure on a single show order is not worth hedging. The rate is held for the quotation validity period printed on the document, and settlement is staged against production rather than against the show date: the material commitment falls at print release and the balance on delivery confirmation against the freight document and the packing list.

Cross-border consignments move through the standard import regime at the destination. The supplier prepares the commercial invoice, the packing list with commodity codes, the transport document and the buyer’s purchase order; the importer of record is named on the order before the first shipment, because that field decides who signs the customs declaration and who carries the duty line. The supplier does not prepare customs declarations and does not act as importer on the buyer’s behalf.

Delivery is booked as a slot, not as a date, because a build-window slot is the only delivery time that actually works for this calendar. The booking names the hall, the stand address, the loading entrance, the crane or forklift requirement if any, the collection window on the closing day and the named person who signs for the consignment. Heavy catalogue cartons move by road as consolidated freight and take longer; apparel and crew kits move by air on a lane that lands one to three working days out. The closing-day collection is booked at the same time as the delivery, because an undelivered collection slot means a stranded pallet at a hall that is being cleared.

Frequently asked questions on Construction Week Armenia procurement

When is Construction Week Armenia held, and what does the build window change?

The next edition is planned for 25 and 26 March 2027 in Yerevan, with a build-up period before the first day and dismantling after the last. The build window, not the opening day, is the date that governs a merch brief, because stand material, printed catalogues and assembled displays all compete for the same access slots. The organiser publishes the hall allocation, the stand addresses, the mounting times and the loading access in the exhibitor manual, and production is scheduled backwards from the published access window. A delivery on the morning of the first day is a common and expensive mistake on this calendar.

Do you supply high-visibility clothing, helmets or other protective equipment?

No. Personal protective equipment is a regulated product category and is bought from a qualified supplier, and nothing produced here is described as protective or certified to a safety standard. What we do is decorate the company’s own garments and produce printed or embroidered caps, and we produce printed decals and vinyl marks for helmets and vehicles the company already owns, applied by the buyer or by its own site services. Where a contractor requires certified protective equipment, that requirement sits outside the merch brief entirely and we do not substitute an uncertified item for it.

How should a technical catalogue be specified so it survives use in a tender submission?

Start from the page count and the binding, because that decision governs the paper and the cost. A short brochure wants saddle stitching or a staple; a 120 to 200 page catalogue wants a lay-flat binding such as wire-O, Swiss binding or a sewn section so it opens flat on a bench and does not crack at the spine in a project folder. Proofing has to include the specification pages at full size, with a gutter check on every table that crosses the spine, and the buyer’s technical author signs that proof. Specification sheets and warranty cards are best run as separate short lines so they can be updated without re-running the catalogue.

Is Corp-Merch a partner or official supplier of Construction Week Armenia?

No, we are not. Corp-Merch is an independent external merch supplier. We help building materials manufacturers, contractors, dealer networks and crew teams prepare their own apparel, printed material and giveaways for the week. We do not organise, sponsor, represent or act for the organiser, the venue, or any participating exhibitor, and nothing on this page implies an arrangement with any of them.

Corp-Merch is an independent external merch supplier working with building materials manufacturers, contractors, dealer networks and crew teams who attend Construction Week Armenia.
This page describes merch and printed documentation for a buyer’s own exhibition presence and is not an offer of official event services.
Corp-Merch does not organise, sponsor or represent the organiser, the venue, or any participating exhibitor or contractor.
Event names, marks and programme details remain the property of their respective owners and are used here only to identify the calendar this brief is written against.

Send the Construction Week Armenia merch brief