How to decide: the run-length decision table and a verdict for each situation
| Decision variable | Short run, 25-250 units | Bulk, 500 units and above |
| All-in unit cost | High: roughly 2-2.5 times the bulk rate on a simple tee design | Low: setup and mill pricing amortised across the run |
| Cash committed before production | Typically under one million AMD at 50 per cent deposit | Several million AMD, released weeks before the goods sell |
| Inventory risk | Negligible; unsold pieces can be absorbed as samples or spares | Real and quantified; the shortfall case is a write-down |
| Forecast exposure | Low; a wrong forecast costs a second small order | High; a wrong forecast in either direction is expensive and asymmetric |
| Minimum order | Effectively none | 300-1 000 per colour and style from most mills; a distributor sells below that at a higher price |
| Colour and quality control | Whatever is on the shelf; colour varies between re-orders | One dye lot across the programme, matched to a physical reference |
| Lead time | 7-12 working days from approved artwork | 5-9 weeks from approved artwork, plus inbound transit if imported |
| Re-order cost | Almost identical to the original price | New lot, new setup unless screens are retained; priced as a fresh order |
| Best fit | Test runs, first-time designs, fixed headcount, hard event dates | Repeat designs with known take-up, growing teams, multi-year programmes |
The verdicts below assume a corporate merchandise programme priced in AMD and delivered into Armenia.
Choose a short run when the design has never been produced before. The cost of being wrong about an untested design is not the unit price; it is a bulk programme of 1 500 units nobody wants. A 100-unit test run is the cheapest insurance available in this category.
Choose bulk when the design is a repeat and the audience is known. If the same logo went out last year to a headcount you can count, the forecast risk has largely been removed already, and the unit-cost saving is the largest available. This is the clearest case in the whole page.
Choose the medium run of 300 to 500 units when the forecast is soft. It captures most of the volume discount, keeps the cash commitment inside a single budget line, and leaves room to top up later rather than being locked in early.
Choose short run when the event date is immovable and the forecast is contested. A late reprint is worse than an expensive original, because it arrives when the money cannot fix the date.
Choose bulk when the programme recurs annually and the design will not change. The reusable screen argument makes the second-year order cheaper than the first, which inverts the usual logic and rewards early design discipline.
Choose short run when there are more than about five separate designs. Setup scales with designs, and above roughly five designs the setup term will dominate any volume saving available. Constrain the design language instead of accepting the cost.
Never choose a mill bulk run for hard goods on an unproven forecast. Tooling and plate costs amortise over 1 000 to 3 000 units, and the loss on unused tooling plus unsold stock can exceed the entire goods cost.
Ask for both numbers in writing. A serious supplier will quote the programme at a short-run and a bulk quantity in the same document, with the setup line broken out on both. A supplier who quotes only the number that suits the forecast is not quoting a comparison.