How to decide: the hybrid split and a verdict for each situation
| Decision variable | Local supplier | International factory |
| Lead time from approved artwork | 7-15 working days | 25-60 days |
| Minimum order quantity | 25-150 units per design | 300-1 000 per colour and style; a custom dye lot more |
| Unit cost at 1 000 units | 4 200-5 200 AMD before VAT | 3 700-4 400 AMD before VAT |
| Unit cost at 5 000 units | Marginally better, capacity permitting | 2 900-3 700 AMD before VAT |
| Freight and clearance | Not applicable | Adds roughly 10-25 per cent to goods value at 1 000 units |
| Customs | None beyond an internal EAEU declaration | Import clearance, duty by classification and origin, VAT at import |
| Custom colour | Standard stock colours; a custom dye lot is possible but priced as an exception | Core capability; dye lot matched to a physical reference |
| Quality control | Physical sample inspected in person; sealed reference sample held locally | Photo approval, courier standard, third-party pre-shipment inspection |
| Rework turnaround | 5-7 working days | 25-45 days |
| Account management | Same working day, same time zone, decision by the owner | Time-zone gap, usually an intermediary, decision chain longer |
| Currency exposure | Minimal; cost and contract in the same currency | Quote validity period; USD or EUR exposure over production and transit |
| Best fit | Fixed dates, low quantities, personalisation, iteration, spare and replacement stock | High volume, stable specification, custom colour, repeat programmes |
The verdicts below assume corporate merchandise delivered into Armenia and priced in AMD.
Choose local when the date is immovable. No international route can recover a deadline missed by ordering late, and a local reprint takes a week where a remote one takes a month. Where the date matters more than the price, this overrides everything else on this page.
Choose local when the quantity is below the mill minimum. Below roughly 300 units per design the imported route is either unavailable or uneconomic, and buying surplus stock to reach a minimum is a decision about merchandising, not about sourcing.
Choose international when the programme runs to several thousand units of a stable design in a custom colour. Above the freight threshold the ex-works advantage becomes the landed advantage, the custom dye lot is available, and the specification has already been proven by a prior run.
Split the programme rather than choosing one route for everything. Run the deadline-critical, personalised and low-quantity lines locally, and run the high-volume, spec-heavy lines on an imported bulk order consolidated into one shipment. This is the answer most programmes should end up with, and it is the one that requires the buyer to manage two specifications instead of one.
Choose local when the design will still be changing in three weeks. Iteration is a capability, not a service level. A supplier who can print a revised version on Thursday is solving a different problem from one who can quote it on Thursday and deliver it in six weeks.
Do not choose a route on unit price alone. A landed cost that omits freight, clearance, duty, VAT treatment, rework exposure and the working capital of transit is not a landed cost. Ask for the full structure and compare it against the calendar, because the two answers together usually settle the decision.