Five questions that settle it in ten minutes
1. What is the latest acceptable date, and is it fixed? If the date cannot move, the route is decided before any other consideration. A fixed date inside two weeks is a local-production order. A date three months out leaves room for either route, and you should keep comparing on cost.
2. How many pieces, and how certain is that number? Certainty matters as much as size. A confirmed 1 000 pieces of a standard item is an import. An estimated 1 000 pieces of a custom item is a local order with a re-run risk. Where the number is a forecast, buy the first tranche locally and reassess against actual consumption.
3. Is the item something Armenia can make? Ask the process rather than the product. Embroidery, screen printing, direct-to-garment, woven and sublimated decoration are all available locally. Moulded plastic, specialised electronics, particular ceramic or enamel forms are not. If the answer is no, importing is not a preference but the only option, and the useful question becomes whether a different item meets the brief.
4. How many correction rounds do you expect? Every round costs time and money, and the cost of a round rises sharply with distance. A design that will certainly change three times should be produced where changing it is cheap. If the artwork is signed off and immutable, this stops mattering.
5. What happens if it goes wrong? Price the recovery, not the purchase. A local remake is days. An imported replacement is a new shipment with the same documentation step and the same risk. For visible items going to people who will judge them, that difference is often larger than the unit-price difference that started the conversation.
Importing wins on unit cost and product range; local production wins on time, flexibility and recovery. Once the deadline is fixed most orders are not close calls, which is why that is the first question rather than the last.