Audiences · agencies and channel partners · white-label · 500-3,000 piece runs

White-label merch programmes for sales teams and resellers

For sales teams, channel partners, marketing agencies and brand consultancies in Armenia who need to quote branded merchandise to a client and never mention who makes it. One programme covers 3 to 8 end-clients, each brief running 500 to 3,000 pieces, with an annual total between 1,500 and 24,000. We set out what the framework commits you to, how AMD pass-through billing keeps each client separate, which decoration method fits which quantity, where the 7 to 25 working day production lead time actually goes, and what happens when one client is in Yerevan and another is shipping through the EAEU corridor. Production runs in Yerevan industrial zones and in Vanadzor at VAT 20%.

What you are actually selling

You are selling production capacity that your client never sees, wrapped in your own brand. That sounds simple until three clients want delivery in the same fortnight, each with its own colours, its own logo lock-up and its own compliance requirements. The order profile that results is narrow and predictable: 500 to 3,000 pieces per end-client brief, 3 to 8 briefs in a programme, 1,500 to 24,000 pieces a year. Below that band the coordination is not worth selling; above it, direct factory pricing takes over.

Two commitments sit underneath every quotation. First, your client sees your brand on the product, the packaging, the packing slip and the invoice, and never sees ours. Second, the commercial counterparty is you: an AMD master invoice comes to you, and you raise a pass-through invoice per end-client from lines that already exist. Goods either consolidate at your central Yerevan business-district office for inspection and repacking, or ship direct to the client's receiving point under blind labels when the client runs its own sites.

The clock is the third commitment, and it is the one that decides whether you can win the next one. Your own brief takes 2 to 4 weeks from submission to a production lock, the client signs off in 1 to 3 weeks, locking production with us takes 1 to 2 weeks, and the shipping window is 1 to 2 weeks before the event. Six to 10 weeks is the honest number for a single end-client brief. Running several in parallel is what makes the model profitable for you, and the master brief is usually signed by your account director or partner operations lead.

Quantity, method and capacity

Pick the method from the quantity

Screen printing, direct-to-film and embroidery each start at 50 to 100 pieces. Sublimation starts at 25 to 50, which is the right answer for polyester items where the mark has to sit inside the fibre. Direct-to-garment starts at 1 to 10 and exists so that a client can add ten pieces to a live event without becoming a new production project. Quoting a method before quoting a quantity is how programmes end up above their own minimums by accident.

Know the throughput before you promise a date

Screen printing moves at roughly 1,500 pieces a week and laser at about 10,000. Production is split between Yerevan industrial zones and Vanadzor: short deadlines and top-ups stay in Yerevan, long laser and embroidery runs queue in Vanadzor. Quoted production lead time is 7 to 25 working days by method and quantity, before any approval time on your side or your client's.

Size runs belong in the brief

Apparel quantities are planned with a size curve, and size exchange is the predictable consequence. Hold 10 to 15% per end-client for defect replacement and size exchange so claims come out of an agreed allowance. A buffer that is fully consumed usually points at the specification, so change the size curve or the fabric weight rather than restocking replacements.

Budget VAT-inclusive, always

VAT at 20% is applied to every invoice, and quotations are normally built exclusive of it. A brief approved at one figure and invoiced at another is a procurement argument, not a pricing error. Put the exclusive figure and the tax line in the same quotation so the client's finance team sees the number it will actually pay.

What the framework commits you to, point by point

1. White-label ordering with AMD pass-through

One AMD master invoice is raised to you, with supplier branding removed from all cartons, packing slips and shipping labels. Settlement is in AMD through AmeriBank, Ardshinbank, Converse Bank or Acba Bank, with ArCa and Idram handling smaller deposits. Each end-client gets its own pass-through invoice from you.

2. Separate guidelines, applied in parallel

Every end-client has a guideline binder covering the logo lock-up, Pantone references, typography, do-print and do-not-print lists, packing rules and that client's compliance demands, refreshed whenever the brand changes. A mock-up for each new SKU comes back within 2 to 3 working days of brief acceptance.

3. The EAEU corridor for regional work

When an end-client sits in Russia, Kazakhstan, Belarus or Kyrgyzstan, the shipment moves through the EAEU customs corridor alongside the Armenian leg. We coordinate with HayPost, SPS Express, DHL Armenia and FedEx Armenia, and clearance runs on the standard regime of the destination country. Corridor freight is shown as its own cost line on the pass-through invoice.

4. Confidentiality handling

An NDA is signed before work starts, our production and shipping staff are briefed on the white-label requirement, the supplier brand comes off packaging and labels, and billing is built as AMD pass-through. The arrangement is reviewed annually and whenever your contract terms change.

5. One production base for mixed products

Organic cotton and recycled-polyester apparel, non-tinning food-grade steel drinkware, aluminium and printed-metal notebooks, recycled bags and recycled-paper notebooks are produced in one base across Yerevan industrial zones and Vanadzor. Every end-client brief keeps its own schedule inside that single relationship.

6. Qualification you can put in a checklist

Multi-client guideline handling, AMD pass-through billing capability, a working EAEU shipping system, a certification file covering FSC, GOTS, GRS, OEKO-TEX Standard 100 and non-tinning food-grade steel, and willingness to sign confidentiality terms. Expect 2 to 4 weeks for selection, and start it before you need it.

7. Implementation and the quality ledger

Production release, quality control and delivery run per end-client, with defect, replacement and size-exchange percentages recorded against that client's code. The 10 to 15% buffer held for each client is what accepted claims draw on, without a supplementary purchase order.

8. Twelve-month terms

The framework agreement runs 12 months with a cumulative annual volume, AMD payment terms at 50/50, confidentiality conditions and agreed quality standards. The master invoice settles 50% at the production lock and 50% at delivery, which keeps cash aligned with the work actually done.

How an order moves through the year

What goes into a client brief

A completed end-client brief fixes the AMD budget envelope, unit quantities per SKU, delivery addresses, dates, the brand guideline, compliance requirements, defect tolerance and a general decision timeline. Content usually mixes an apparel SKU in a specified Pantone, a drinkware SKU in non-tinning food-grade steel or a ceramic mug, a desk item in aluminium or printed metal, and a tech accessory such as a USB-C hub or wireless charger in client-specific printed packaging.

When each party has to move

The client brief is submitted 8 to 12 weeks before the event, your production lock is 6 to 8 weeks ahead, ours is 4 to 6 weeks ahead, and the shipping window opens 1 to 2 weeks out. Your brief acceptance takes 2 to 4 weeks and client sign-off 1 to 3 weeks. Four gates bring the three parties together: brief acceptance, production lock, dispatch and delivery acceptance.

The three failures to design out

A guideline that is not locked at brief acceptance brings late design changes and a compressed window. Merging several end-client briefs into one production run breaks the guideline and delivery rules. A pass-through invoice that does not match the client's AMD budget envelope turns a routine approval into a finance escalation. Each of them is settled or created at brief acceptance.

A worked year: three clients, 4,200 pieces

A marketing agency with a headquarters in central Yerevan ran three end-client briefs in one season, 4,200 pieces at about 6.8 million AMD. Client A took 1,800 pieces of apparel and drinkware for a technology community event in Yerevan. Client B took 1,400 pieces of drinkware and desk items as loyalty gifts for a hospitality account. Client C took 1,000 pieces of apparel and tech accessories for a fintech launch. All three were merged into a single supplier relationship with pass-through invoicing and separate deliveries.

How it reconciled

Defect replacement finished at 1.0% and size exchange at 4%, and the safety buffer covered both without a supplementary order. The master invoice settled half at the production lock and half at delivery. Client-side finance saw only their own pass-through lines, never the consolidated AMD total across the other two accounts.

The monthly shape of the programme

Months 1 to 3 carry brief acceptance and guideline application. Months 4 to 9 run production, delivery and the compliance files. Months 10 to 12 close delivery acceptance, defect replacement, pass-through invoicing and the AMD master account before the framework is reviewed for renewal.

What the client actually receives, item by item

Goods packed under the client's own brand

Cartons arrive with no supplier mark on the product, the wrap, the packing slip or the shipping label. Each end-client's units are packed and counted separately even when several clients share one delivery address, and the packing list repeats the same structure in writing. That way the allocation stays uncontested when your team opens the boxes and the client's own staff open them later.

The compliance file in the same carton

The file covering FSC, GOTS, GRS, OEKO-TEX Standard 100 and non-tinning food-grade steel in 18/8 or 18/10 travels with that client's goods rather than in a separate courier envelope, and it is archived against the pass-through invoice it belongs to. Sending it with the product means the client's procurement team has it on the day the boxes arrive, which is usually the moment they ask for it.

Documentation the client's finance team expects

Each delivery carries a packing list, a per-client delivery note and the pass-through invoice lines behind it, all in AMD with VAT at 20% applied consistently. VAT-exclusive and VAT-inclusive figures appear separately in the quotation so the approval matches the invoice. Nothing in the paperwork names the supplier, and nothing requires your client to call anyone but you.

What your team keeps on its side

A master calendar with the four gates marked, one guideline binder per end-client, a per-client ledger of defect and exchange percentages, and a record of the buffer consumed by each client. That set is what makes the second year faster than the first, because the next quotation is built from last year's real numbers instead of from an assumption.

Regional clients and the extra paperwork

An end-client outside Armenia adds a customs leg and a document set, not a different production process. The shipment runs through the EAEU corridor with HayPost, SPS Express, DHL Armenia or FedEx Armenia, cleared under the standard regime of the destination country, and the freight line appears on the pass-through invoice so the client can see the real cost of shipping rather than a blended one. Transit time is quoted per destination rather than assumed from the domestic leg, and it is worth building into any regional delivery promise you make to the client.

Documents, cross-border shipping and the alternatives

The compliance file your client will ask for

Each end-client receives a file covering FSC, GOTS, GRS, OEKO-TEX Standard 100 and non-tinning food-grade steel in 18/8 or 18/10 where items touch food. It travels with the goods to that client's receiving point and is archived against the pass-through invoice, so a procurement audit months later has a document attached to the right invoice. Our brand does not appear on the cover page.

Two sites, one queue, different rules

Yerevan industrial zones handle short runs and tight dates, where moving a queue position costs a day. Vanadzor carries the longer laser and embroidery work, where a week of queue position is cheaper than a week of express handling. Splitting a programme across the two sites is normal; promising a deadline against the wrong queue is what causes the emergency shipment.

What the other three routes give up

Bringing production in-house buys volume and full compliance control at the cost of a fixed minimum and a certification pack you maintain. Going direct to a white-label factory lowers unit price but usually means your client's guideline is not applied. Wholesale distributors offer a broad catalogue and simple administration with no white-label handling and no pass-through billing. Each route trades something different, so price them against the rework you expect to absorb.

The honest limit of the model

A single end-client brief above 5,000 pieces is where this stops being the right structure, because direct factory discounts apply at that scale. Between 1,500 and 24,000 pieces a year, across 3 to 8 clients, the framework is the cheaper operating choice: you give up some unit value and buy guideline application, AMD pass-through billing, delivery reliability and confidentiality that holds.

Questions sales teams ask us first

How do I quote a client without exposing the supplier?

Quote lines, not a rate card: blanks by specification, decoration by method, packaging, delivery by zone and the buffer as its own line, all in AMD with VAT at 20% shown separately. A client cannot ask who made the goods from a document that never names them, and a breakdown like this is easier to defend in a client review than a single blended figure.

What if one client needs delivery much earlier than the others?

Briefs run as separate production slots, so an early client can be pulled forward without moving the rest. The constraint is method rather than policy: work already queued at Vanadzor moves as a block, while screen printing and direct-to-garment on the Yerevan floor can absorb a shorter notice. Tell us the real date at quotation stage rather than promising flexibility you have not tested.

How many clients can realistically share one programme?

Three to eight is the working range. Below three, the white-label overhead is hard to justify; above eight, guideline management and per-client compliance files stretch the account owner's week and the 12-month framework starts carrying volume assumptions that no longer hold. Splitting into two programmes is the usual answer beyond eight.

Which banks and payment routes are supported?

Settlement is in AMD through AmeriBank, Ardshinbank, Converse Bank or Acba Bank, with ArCa and Idram available for smaller deposits. The master invoice splits 50% at the production lock and 50% at delivery. End-clients never appear as counterparties on our side; their payment terms are between you and them.

Do regional clients add cost to the same programme?

They add freight and customs documentation rather than production cost. Corridor shipments run through the EAEU route with HayPost, SPS Express, DHL Armenia and FedEx Armenia, cleared on the destination country's standard regime, and the freight appears as its own line on the pass-through invoice so the client can see what shipping actually costs.

This page is informational for Armenian sales teams, marketing agencies and channel partner programmes. Corp-Merch is an independent B2B merch supplier working under a white-label model. Mentions of well-known Armenian companies describe an order profile and imply no partnership, sponsorship or capital relationship.